How Long Does a Roof Replacement Take?

How Long Does a Roof Replacement Take?

What happens on install day, and how to get your home ready.

By Chase Shewmaker, owner of Shewmaker Roofing · Updated October 2026

The Short Answer

Most shingle roof replacements on a typical Northwest Arkansas home take one to two days once the crew arrives. Larger, steeper or more complex roofs can take longer, and standing seam metal roofs usually take several days.

What Affects the Timeline

  • Roof size. More squares means more time.
  • Pitch. Steep roofs require extra safety setup and slow the work down.
  • Complexity. Valleys, dormers, skylights and chimneys all take extra detail.
  • Layers and decking. Removing multiple old layers or replacing a lot of rotted decking adds time.
  • Material. Metal panels are measured and ordered for your roof, and installing them takes longer than shingles.
  • Weather. We don't tear off a roof with rain in the forecast. Spring storms in NWA can shift schedules.

Step by Step: Replacement Day

  1. Protect the property. Tarps go over landscaping, AC units and anything near the house.
  2. Tear-off. The old shingles and underlayment come off down to the deck.
  3. Deck inspection. Any soft, rotted or damaged decking gets replaced.
  4. Underlayment and drip edge. Water barrier goes down, with ice and water protection in valleys and around penetrations.
  5. Flashing. New flashing at walls, chimneys and vents, which is where most leaks start.
  6. Shingles and ridge. Shingles go on, then ridge caps and ventilation.
  7. Clean-up. Debris hauled off, and a magnet run over the yard and driveway for nails.
  8. Final walk-through. We check the work and go over it with you.

How to Prepare Your Home

  • Move cars out of the garage and driveway
  • Take pictures and fragile items off interior walls, since hammering can rattle them
  • Cover items stored in the attic. Some dust will fall during tear-off
  • Keep pets and kids inside or away from the work area
  • Let your neighbors know it'll be noisy for a day or two

Do you need to be home? No. Plenty of our customers are at work or out of town during their install, and we keep them updated with photos.

Ready to schedule? Call (479) 372-3622 for a free estimate.

More Guides

Our Services

FAQ

Common Questions

How long does a roof replacement take?

Most shingle replacements on a typical home take one to two days. Larger or more complex roofs and metal roofs take longer.

Can it rain during a roof replacement?

We plan tear-offs around the forecast and only remove as much roof as we can dry back in the same day.

Do I need to be home during my roof replacement?

No. We'll keep you updated and send photos while the work is happening.

Is a roof replacement loud?

Yes, tear-off and nailing are loud, but it's usually over in a day or two.